Main parameters
Hole Diameter
138mm-180mm
DTH hammer
5‘’ or 6''
Drill pipe diameter
110mm or 133mm
Drill pipe length
8.5m*3m
Maximum hole depth
25m
Dust removal device
Dry (standard); Water mist (optional)
Display operating language
English/French(customization)
Air compressor
Pressure
21Bar
FAD
28.3m³/mi
FAD
472L/s
Engine
Brand
CUMMINS
Model
QSB4.5-C130-30
Power
97kW/rpm/2200kW/rp
Fuel tank
200L
Electric Motor Max. Power
344kW
Feed
Total length
11.5m
Feed extension
1.8m
Feed force
75kN
Carrier
Traveling speed
3.2km/h
Max. traction
180kN
Gradeability
25°
Ground clearance
480mm
Rotary head
Slewing speed
0-105rpm
Slewing torque
6500Nm
Dimension
Weight
L × W × H (Working)
9.6*4.7*11.5m
L × W × H (Transportation)
11.5*3.6*3.5m
● Diesel-electric dual power ● Low voltage drop ● ROPS and FOPS cab ● IP 65 protection. The diesel -electric dual power traveling is driven by diesel engine, which is flexible ; operation is driven by
Read more >
Drilling method: Separated Down-the-holeHole diameter: 90-152mmDTH-hammer: 3.5, 4 and 5 inchesEngine brand: YuChai● SWDQseries crawler hydraulic surface down-the hole drilling rig, with comprehensivel
Read more >
The drilling rig can be transported with drill pipe, eliminating the need for disassembling before transportation; Single-layer winding of steel rope for minimal rope wear, increasing 50% of rope life
Read more >
Drilling method: Down-the-holeHole diameter: 180-230mmDTH-hammer: 6 and 8 inchesPipe length: 10m● The SWDA series with the diesel-electric dual power, traveling is driven by diesel engine, which is fl
Read more >
Drilling method: Down-the-holeHole diameter: 90-138mmDTH-hammer: 3.5, 4 and 5 inches●The SWDE series is surface down-the-hole drilling rigs which have a drilling diameter of 90-230mm and a max drillin
Read more >
Involved Machine:SWDE165B Project Overview:The project is about the application in high-altitude areas at Xinjiang Huoshaoyun Lead-Zinc Mine. Despite being in the forbidden area of life with an altitude of 5600m, our advancedrock drilling rig SWDE165B fro
Read more >
Involved Machine: SWDR138B Project Overview: The working platform of this project has an average altitude of 4,910m, with the local altitude surpassing 5,000 meters.
Read more >
Involved Machine: SWDR138B Project Overview: The working platform of this project has an average altitude of 4,910m, with the local altitude surpassing 5,000 meters.
Read more >
▶ Involved Machine: SWDH102S ▶ Project Overview: Application of Famous Project: The Line Project in UAE with 50 top-hammer drill rigs
Read more >Copyright © Hanggang Heavy Industry (Zhejiang) Technology Co., Ltd