▶ Involved Machine: SWDE152I
▶ Project Overview: The Gold - Copper Mine project showcases advanced rock-drilling equipment. The mine deals with rocks of hardness F15 - 18, and the construction requires drilling holes with a depth of 12m and a diameter of 152mm.
Sunward’s products play a crucial role in this project. EspeciallySWDE152I 5G intelligent drilling rig, which leverages 5G technology for enhanced efficiency and precision in drilling operations.
Also another SWDE138 integrated down-the-hole drilling rig, which is designed for efficient penetration of hard rock formations.
This project aims to build a green and intelligent mine, combining advanced equipment and modern technology to achieve sustainable and efficient mining operations.
Contact